construction-on-10-24 Published November 11, 2008 at 2355 × 1766 in construction-on-10-24 ← Previous Next → Framing the second floor, taken from the sidewalk. By October 24th, the second floor had been framed, along with windows and roof shingles. This image shows the addition, from the sidewalk in front of our neighbor’s house to the east.