The progress for our project, through October 24th, posted a bit late–long story that. Over the next couple days, I will post more, as the cedar shake siding is complete, the windows are finished, and the porch roofs are also finished. We even have a first coat of primer. But, this is the view after about three weeks. I will do the last couple weeks in posts over the next few days.
- The view of our house from the neighbor’s drive, before construction began in September.
- The first floor of the addition is being framed by our Amish carpenter team, from October 2008.
- On October 24th, the carpenters had almost completed putting the shingles on the roof and had installed windows.
- This reprise of the rear of the house, taken before construction began, shows the rear wall of the house.
- As the first floor went up, taken from the drive, looking along what had been the rear of the house.
- The second floor and windows are now in, along the West side of the addition.
-
Looking toward the family room from where the kitchen will meet the informal dining area.
- Looking toward the breakfast area and the kitchen, taken from the family room, looking West.
- View of the front and side, South and East exposures of the house after the foundation, before framing.
- The second floor master bathroom and office, after it is framed in.
- The second floor, master bedroom, as seen from the master bath.
- Framing the second floor, taken from the sidewalk.